(925) 441-3346 Book a visit
  1. Home
  2. Getting approval
Signature page

Getting an outdoor unit approved

In this part of the Peninsula the association is usually the long pole in the job. This page is about what they actually decide, and what a committee can act on.

Three things to hold on to.

One: a conversation is not a submission. Committees approve documents. Dimensions, exact placement measured from a fixed point, the manufacturer’s published sound rating, what is visible from where, how it is fixed and what is penetrated. A verbal “we’re putting in air conditioning” gets a verbal answer that nobody is bound by.

Two: we will not read your rules for you. Every association here is different and the documents mean what they say, not what a contractor guesses. We do not interpret CC&Rs and we would be careful of anyone who does. What we produce is the technical sheet your board needs; what it means under your rules is a question for the board, the managing agent, or if it really matters, somebody who does that professionally.

Three: start it before you need it. Associations meet on a schedule, not on demand, and a request submitted in July for a problem you have in July is a request for next month. The people who get this done easily start in February.

Pick what you want to do and what kind of property it is. Everything below is written out in full.

Read this
In a condominium with shared plant, the first question is whether it is yours to change.

In a stacked or shared-plant building the equipment serving your unit is frequently not your property, and sometimes the part inside your walls is yours while the part on the roof is not. That is not a technicality — it determines who may authorise the work, who pays for it, and who is responsible when it fails.

Establish three things before anything else. Which components are yours, which are the association’s, and what the association’s position is on an owner altering any of it. Those answers come from the governing documents and the managing agent, not from us and not from what a neighbour did in 2019.

The practical version. If a shared riser, a shared condensate line or a common roof penetration is involved, expect the association to be a party to the work rather than merely approving it. Some buildings require their own contractor for anything touching common elements, and that is legitimate even when it is inconvenient.

We will survey, write down exactly what we found and what it appears to serve, and hand that to whoever needs it. What we will not do is start work on equipment when it is unclear whose it is.

A · Like for like

Replacing what is already there

The easiest case, and the one people most often assume needs no approval at all. Sometimes true. Frequently not, and the difference matters.

Many associations treat a straight replacement in the same position as maintenance and do not require a submission. Others require notification of any exterior work, and a few require approval for anything visible regardless of whether it changes.

Two things that turn a replacement into a change. Modern equipment is often physically larger than what it replaces, particularly in height, which alters what is visible over a fence. And it may sit on a different pad, or need different clearances, which moves it. Either can convert “maintenance” into “alteration” in an association’s language.

So the sensible move is a short written notice with the dimensions of old and new side by side. It costs nothing, it takes one email, and it means nobody can say afterwards that it appeared without warning.

B · Detached

A detached house inside an association

The most straightforward, and the one where people most often skip the submission because it feels like their own land. It usually still is not, in the sense that matters: architectural control frequently extends to anything visible from a street or a common area, whatever the lot lines say.

The practical advantage you have is space. If there is a choice of positions, offering the committee the least visible one, screened, is a very short conversation. If the only position is the visible one, say so in the submission and explain why — clearance, service access, line-set length — rather than leaving them to assume it was chosen for convenience.

Do next

What to do next

Send a short written notice with old and new dimensions side by side, even if you think none is needed. One email, and nobody can say later that it appeared without warning.

End

What we will and will not do

We will produce the sheet. Dimensions, placement measured from a fixed point, manufacturer’s published sound rating with the source named, fixings, penetrations and a marked-up photograph. As a matter of course, before anything is ordered.

We will not interpret your governing documents, and we will not tell you that something is “probably fine”. That sentence has cost people the price of removing equipment they had just paid to install.

We will not install something that breaches your rules. Not quietly, not as a favour, not because the neighbour did it. Work that gets ordered out afterwards comes out at your expense.

And we will not claim a noise level. We will quote the manufacturer’s published figure and say where it came from. What it sounds like at a particular window depends on the building, the surfaces around it and the time of day, and anybody giving you a number for that has not measured it either.

Next

Start the paperwork early

A visit, the positions measured, the options photographed and a submission sheet you can send to your board. Done in winter, it takes the association out of the critical path entirely.